编者按:卡特彼勒为波兰东北部的哥伦比亚河流旁的污水处理厂提供了一套非常有效的电力解决方案,下面是这个方案的原文,其中包括Gresham污水处理厂的电力需求,解决方案,以及最后的成果等。GRESHAM WASTEWATER TREATMENT PLANT
POWER NEED
Located near the Columbia River northeast of Portland, the Gresham Wastewater Treatment Plant (WWTP) is a basic secondary activated sludge facility that receives an average of 13 million gallons/day (mgd) of capacity.
Dating back almost 30 years, efforts were made to curb the plant’s big appetite for power. Anaerobic digesters were installed at the plant in 1990 in an effort to make the plant more efficient by deriving biogas from the solid waste matter that settles out during the treatment process. Raw, untreated biogas derived from the digestersfeda250 kW generator that helped power about onequarter of the plant.
“We wound up turning it off in 2002 when it burned out,” recalls Alan Johnston, senior engineer with the City of Gresham Wastewater Treatment Plant.
In 2005, after receiving grants from the Energy Trust of Oregon and the Oregon Department of Energy, the City installed a Cat® G3508 gas generator set that produces 400 kW in a combined heat and power (CHP) application. The cogeneration system includes a modern biogas scrubbing systemthat removes moisture, hydrogen sulfide and siloxanes.The Cat genset produces power and heats the buildings with jacket water heat. It has been supplying 50 percent of the treatment plant’s power needs since 2005, saving about $250,000 in annual avoided electrical costs.
But even with the addition of theCat 400 kW cogeneration unit, excess biogas had to be flared, Johnston says. In 2007, Gresham’s mayor, Shane Bemis, signed a climate action agreement with the U.S. Conference of Mayors, which ultimately led Johnston to examine ways to make the treatment plant even more energy efficient.
SOLUTION
After further analysis, Gresham decided to shift its focus in 2008-09 to reduce power consumption while increasing biogas production.
The journey to energy independence began in 2009 when the Gresham WWTP received a grant from the Oregon Economic Development Commission to study ways to increase the environmental and operational efficiency of the treatment plant. One outcome was a study on the benefits of accepting fats, oils and grease (FOG) from restaurants to remove them from the waste stream and instead use them to boost electrical generation.
based on revenues generated by a FOG tipping fee at the facility and avoided electrical utility fees,the conclusion was that it would be cost-effective with an ROI of seven years. Gresham acted on the recommendation, and currently takes in about 30,000 gallons per day of FOG. The product is slowly injected into the digesters, and according to Johnston, the organic matter has nearly doubled biogas production.
“FOG has a lot of energy stored in it, or about 12 cubic feet of biogas produced for every gallon injected into the digesters,” Johnston says.“The study concluded that adding FOG receiving facilities is economically viable, and it turns out that there is amarket for this service in our area.”
Energy net zero means producing the same amount of energy that a facility uses to operate.
For Gresham, net zero became a real goalin 2010 when investments were made as part of the capital improvement cycle. A formal energy management team was created, and Gresham established a goal of achieving energy net zero at the WWTP by 2015.
The increase in biogas made possible the installation of a second Cat G3508 gas generator set in 2015, thereby increasing power output and allowing the facility to operate on its own, independent of power from the utility grid.
With support from management and staff, five major capital upgrades were phased in over a five-year span.
In February 2015, on schedule and on budget, the first energy net zero month occurred. The WWTP generated more electrical energy on site from renewable biogas cogeneration and solar power than it consumed. Today, the Gresham WWTP generates about 10 percent more electricity than it needs via a combination of energy efficiency, codigestion and cogeneration, and a solar array.
“We didn’t do it just because it was fun and exciting, we did it because it made financial sense,” Johnston says. “That’s how the City of Gresham operates, and we had shown over 10-year period we’d have a seven-year payback on all of these projects, and that’s really what sold it to the mayor.
“We’ve had a ton of support—all the way from my bosses to managers to the city council and mayor through all of these projects—and I’m glad it was so successful because I pushed it for years saying it would work, and it has.”
Over the 10-year journey to energy net zero, the Energy Trust of Oregon supported the City of Gresham with technical assistance, project development support, and cash incentives that lowered the costs of the energy efficiency measures—as well as the two CHP generator sets and the facility’s solar array. Business Energy Tax credits and biomass incentive funds from the State of Oregon also were essential to making net zero a reality.
RESULT
Now entering its fifth year of operation as a net zero wastewater treatment plant, Gresham is the first facility of its kind in the Pacific Northwest and the second in the country to hold that distinction.
The net result is about $1 million in annual savings to the ratepayers of Gresham, which includes $500,000 in avoided utility costs, $350,000 from FOG tipping fees, and the balance in avoided costs by utilizing the jacket water heat from the generator sets to heat the buildings. As an added benefit, Class B biosolids that are the byproduct from the anaerobic digesters are applied to agricultural fields as fertilizer at no cost to area farmers.
“When you talk about our wastewater treatment, which traditionally has been our biggest energy hog, in less than 10 years it’s producing its own energy on site,” Bemis says. “So it’s not only green in terms of green energy, it’s green in terms of money.”
Achieving net zero status is made possible by the high uptime of the Cat gensets, Johnston says. To ensure continuous operation, Gresham relies on its Cat dealer, Peterson Power Systems, which provides service through a Customer Support Agreement.
“One of the big reasons why we have a successful program here is because of the relationship we have with our local Cat dealer, Peterson,” he says. “Anytime we have issues with the engines, we call them, and we have a guaranteed 24-hour interval for their technicians to come out here to fixthe problem.
Over four years, Gresham’s cogeneration plant has averaged about 95 percent uptime.
“And we couldn’t have done that without the support of Peterson Power Systems,” Johnston says. “If the Cat engines aren’t running, we’re in trouble. So, we try to average over 90 percent run time, and in over four years we’re at 95 percent and that includes all the overhauls, top end work, oil changes, and unrelated construction issues that take those engines down.
“So really, it’s a pretty impressive thing when you think about it—if the engines run 80 percent of the time, we’re not net zero,” Johnston adds. “It’s always easy in the honeymoon phase of big projects to have engines running good and everybody’s happy, but to have done it now for four years with all the issues you run into with older equipment, it’s pretty impressive.”
Customer
Gresham Wastewater Treatment Plant
Location
Gresham, Oregon
Customer Business Issue
Energy self sufficiency
Solution
G508 gas generator sets (2), C9 diesel genset, paralleling Switchgear (480V)
Cat Dealer
Peterson Power Systems
2021年03月26日关于ICIS:两会“30·60”目标将加速能源化工行业产业链规范与创新的最新消息:中国上海,(2021年3月24日)当两会热词"碳达峰"与"碳中和"加速出圈后,自2013年就进入中国碳市场的ICIS中国市场开发总监徐蓉表示,"30·60"目标将进一ICIS:两会“30·60”目标将加速能源化工行业产业链规范与创新
2021年03月24日关于监测电化学储能技术的创新:一种基于专利的方法的最新消息:导读慕尼黑工业大学的一项新研究表明,亚洲开发商在储能系统方面处于领先地位,并远远超过美国和欧洲的竞争对手。慕尼黑工业大学(TUM)的一项新研究显示,近年来电化学储能技术的专利申请数监测电化学储能技术的创新:一种基于专利的方法
天津展抢先剧透,骑幻重磅产品矩阵线上揭幕, 作为电动车行业最大规模性的行业展会,时隔一年,天津展再度回归。懂行的经销商们早已安排好行程,准备在天津展一窥“后疫情时代”的行业动向。天津展抢先剧透,骑幻重磅产品矩阵线上揭幕
2021年03月26日关于现状:华北热电联产供热设备容量超东北的最新消息:热电联产是一种有效的能源利用方法,具有良好的经济和社会效益。在政策推动下,各地区热电联产不断发展。2019年华北地区热电联产供热设备容量首次超过东北地区,主要是山西省太原市加大清洁现状:华北热电联产供热设备容量超东北
全球电池行业规模最大的展览会——“第十四届中国国际电池技术交流会/展览会(CIBF2021)”在深圳会展中心盛大开幕!来自全球1300余家电池、设备、材料及相关配套企业参展,集中展示近三年来全球范围内电池行业所取得的优异成果。四段颠覆性新品“亮剑” 赢合科技再引锂电设备新趋势
2021年03月26日关于浙江电力市场化改革再深化的最新消息:近日,浙江省发展改革委、省能源局、省能源监管办联合印发《2021年浙江省电力直接交易工作方案》(下称《工作方案》),我省今年电力市场化交易正式拉开序幕。《工作方案》显示,2021年浙江电力市场化改革再深化