Cogeneration Plant at Bausch + Lomb in Ireland Cuts Annual Operating Costs by up to €1 Million
In 2016, Bausch + Lomb—a leading eye-health provider best known as manufacturer of contact lenses—commissioned a highly efficient CHP plant in Waterford, Ireland, in line with its energy and sustainability strategy. The project, considered one of the largest of its kind in Ireland, was rolled out by Edina, MWM's exclusive partner in Ireland. With its cogeneration plant equipped with the powerful MWM TCG 2032 V12 genset, Bausch + Lomb covers 65 percent of its electricity needs and 91 percent of its heat needs. Thanks to the high plant availability of almost 98 percent and the MWM gas engine's enormous efficiency and reliability, the company saves about 3,750 t of carbon and has been able to cut its operating costs by up to €1 million a year.
MWM TCG 2032 V12 genset at Bausch + Lomb covers 65 percent of its electricity and 91 percent of its heat needs
Sustainability Strategy
"Bausch + Lomb is delighted with the performance of the cogeneration power plant, both in terms of the payback period and the machine availability. As a result, the company has saved even more emissions and costs than initially expected", explains Derek O'Connor, Facilities Engineering Manager at Bausch + Lomb Waterford.
The CHP plant is remotely monitored on a 24/7 basis in order to automatically detect and alert Edina's service desk of any issues on site
The CHP plant is part of Bausch + Lomb's energy and sustainability strategy to improve its environmental and social impact. The new plant will greatly assist Bausch + Lomb in its annual recertification of ISO standards including ISO 50001. Derek O'Connor recalls: "A number of auto-production technologies were considered for the site, such as wind and solar. However, CHP technology was chosen based on its availability and return on investment potential."
Adapted to the Plant's Performance Needs
The €3.3 million contract awarded to Edina comprised the delivery, installation and maintenance of the MWM genset. The contract also included the construction of a purpose-built energy center to house the genset, the associated ancillary systems, and a separate waste heat steam boiler room. The CHP plant generates electricity at 10.5 kV and interfaces directly into the site's MW ring, providing power to its office buildings, R&D facilities, manufacturing process, and warehouse units. Steam is generated by passing the exhaust gases at over 400°C from the engine through the exhaust gas heat recovery steam boiler and is used for sterilization purposes on site. The low-grade hot water recovered from the engine jacket water is also used and distributed throughout the factory, where it is used for process and space heating.
By installing the cogeneration power plant, Bausch + Lomb has not only saved costs, but has also substantially improved its carbon footprint in accordance with its sustainability strategy.
Thanks to the high plant availability, Bausch + Lomb saves about 3,750 t of carbon and has been able to cut its operating costs by up to €1 million a year
Installation, Support, and Service from One Source
With a five-year service and maintenance contract for the CHP plant, Edina guarantees an engine availability of 95 percent (or 8,322 hours) per annum. The CHP plant is remotely monitored on a 24/7 basis in order to automatically detect and alert Edina's service desk of any issues on site.
Technical data
Operator Bausch + Lomb
Contact: Derek O'Connor, Facilities Engineering Manager, Bausch + Lomb
City: Waterford/Ireland
Operator Bausch + Lomb
Go-live: May 2016
Engine type: 1x MWM TCG 2032 V12
Generator: Marelli MJB 800 MB 6
Gas: Natural Gas
Control: TEM
Performance Data CHP
Thermal efficiency: 43.5%
Electrical efficiency: 43.1%
Thermal output: 3,251kW
Electrical output: 3,333 kW
Total efficiency: 86.5%
Excellent Values
The MWM TCG 2032 V12 genset has been in operation since May 2016. With an availability of 97.2 percent, the plant now generates more than 28 million kWh of electricity, approximately 17.3 Mt of steam, and 12,482 MW of hot water per annum, enough to supply 5,980 homes with electricity and 2,105 homes with heat. What is more, the annual carbon savings amount to up to 3,750 t.
2021年03月26日关于ICIS:两会“30·60”目标将加速能源化工行业产业链规范与创新的最新消息:中国上海,(2021年3月24日)当两会热词"碳达峰"与"碳中和"加速出圈后,自2013年就进入中国碳市场的ICIS中国市场开发总监徐蓉表示,"30·60"目标将进一ICIS:两会“30·60”目标将加速能源化工行业产业链规范与创新
2021年03月24日关于监测电化学储能技术的创新:一种基于专利的方法的最新消息:导读慕尼黑工业大学的一项新研究表明,亚洲开发商在储能系统方面处于领先地位,并远远超过美国和欧洲的竞争对手。慕尼黑工业大学(TUM)的一项新研究显示,近年来电化学储能技术的专利申请数监测电化学储能技术的创新:一种基于专利的方法
天津展抢先剧透,骑幻重磅产品矩阵线上揭幕, 作为电动车行业最大规模性的行业展会,时隔一年,天津展再度回归。懂行的经销商们早已安排好行程,准备在天津展一窥“后疫情时代”的行业动向。天津展抢先剧透,骑幻重磅产品矩阵线上揭幕
2021年03月26日关于现状:华北热电联产供热设备容量超东北的最新消息:热电联产是一种有效的能源利用方法,具有良好的经济和社会效益。在政策推动下,各地区热电联产不断发展。2019年华北地区热电联产供热设备容量首次超过东北地区,主要是山西省太原市加大清洁现状:华北热电联产供热设备容量超东北
全球电池行业规模最大的展览会——“第十四届中国国际电池技术交流会/展览会(CIBF2021)”在深圳会展中心盛大开幕!来自全球1300余家电池、设备、材料及相关配套企业参展,集中展示近三年来全球范围内电池行业所取得的优异成果。四段颠覆性新品“亮剑” 赢合科技再引锂电设备新趋势
2021年03月26日关于浙江电力市场化改革再深化的最新消息:近日,浙江省发展改革委、省能源局、省能源监管办联合印发《2021年浙江省电力直接交易工作方案》(下称《工作方案》),我省今年电力市场化交易正式拉开序幕。《工作方案》显示,2021年浙江电力市场化改革再深化